Bastø I & Bastø II Retrofit

During a dry-dock period, we replaced the old Stenco-Moland System onboard.

Vessel Information:
Build: 1997
Owner: Bastø Fosen
Segment: Ro-Ro/Passenger Ship

During a dry-dock period, we replaced the old Stenco-Moland System onboard with new Høglund Solutions: The system consist of:

  • Macinery Alarm System
  • Ship Performance System
  • GMR Playback
  • Høglund Remote Control, for remote service and support


I/O Cabinet before upgrade

I/O Cabinet before upgrade

Høglund is replacing old cabinets

New Høglund Control Cabinet

New Høglund Control Cabinet

This was a “turn-key” contract. Høglund project and commissioning engineers arranged :

  • Approbation with Factory Acceptance Test together with DNV-GL
  • Cable Pulling
  • Installation, Re-connection and I/O check
  • Harbour Acceptance Test with DNV-GL
  • Sea Acceptance Test with DNV-GL

After the sea-trial Høglund handed over the new system with all approved certificates needed.