Saga Pearl II Retrofit
The refit was performed during a dry-dock in Hamburg November 2015.
Vessel Information:
Build: 1981
Segment: Cruise Ship
Class: DNV-GL
The refit was performed during a dry-dock in Hamburg November 2015. The existing system was a C. Wilh Stein Sohn, alarmsystem from the early 80’s. We replaced this system with new Høglund Solutions. The system consist of:
- Integrated Automation System (IAS)