Saga Pearl II Retrofit

The refit was performed during a dry-dock in Hamburg November 2015.

Vessel Information:
Build: 1981
Segment: Cruise Ship
Class: DNV-GL


The refit was performed during a dry-dock in Hamburg November 2015. The existing system was a C. Wilh Stein Sohn, alarmsystem from the early 80’s. We replaced this system with new Høglund Solutions. The system consist of:

  • Integrated Automation System (IAS)

Switch off board from C. Wilh Stein Sohn

Old I/O Cabinet with controllers and I/O modules

Høglund is replacing old cabinets

Høglund Retrofit Manager working

Høglund taking measures of the operation stations

I/O Cabinet after upgrade

I/O Cabinet after upgrade